QUANTITY SURVEYING · COST CONSULTING

A budget that survives contact with the actual site.

Most cost overruns start the day the site stops matching the drawings. Our quantity surveying is built on live survey data from the same team — not stale plans re-keyed from a third party — so your numbers hold as the project moves.

Cost certainty across the project lifecycle

Cost consulting integrated directly with survey and planning workstreams — one data set, no re-entry, no mismatch.

Cost Estimates & Budgets

Early-stage estimates and feasibility budgets grounded in survey data.

Bills of Quantities

Accurate BoQs drawn from live topographic and cadastral measurement.

Cost Control

Ongoing cost monitoring and valuations through the construction phase.

Volumetric Costing

Earthworks and material volumes measured by drone, priced directly.

Tender Documentation

Cost documentation ready for public-sector tender requirements.

Final Accounts

Transparent reconciliation from budget to final account.

THE DIFFERENCE

Why standalone costing drifts — and ours doesn’t

STANDALONE QS PROVIDERS

They cost off drawings supplied by a separate surveyor — and drawings drift from what the site actually is.

Re-keying measurement between firms introduces error and delay, and no one owns the mismatch when it surfaces.

Larger cost shops add overhead and slow turnaround, then hand you to a junior instead of the person who priced it.

THE TOP GROUP APPROACH

We cost off live survey data captured by our own registered team — the numbers trace back to the ground.

One integrated data set flows from survey to QS with no re-entry, so estimates and quantities stay in sync.

Principal-led and lean — the person who prepared your costing is the person you speak to about it.

Costing tied to the ground, not just the drawing

1

Survey-linked take-off

Quantities measured from our own topographic and cadastral survey.

2

Estimate & budget

A feasibility budget you can trust because it matches the site.

3

Tender & BoQ

Documentation prepared to public-sector tender standards.

4

Cost control

Valuations and monitoring through to a reconciled final account.

Survey-Linked

Costed off live field data

Drone Volumetrics

Measured, not estimated

Principal-Led

Direct to the cost consultant

4 Provinces

GP · MP · KZN · NW

Have questions about survey-linked costing or preventing JBCC variation claims? Read our QS FAQs

Know the real number before you break ground.

Share your development brief or drawings. We’ll run a free feasibility check and give you a cost picture grounded in real survey data — not optimistic assumptions.

No-Obligation Quote SAGC Registered Response within 24 Hours